Skip to content

Industrial Integrated Solutions Manufacturer:

A Smart Warehousing Transformation

Industrial solutions manufacturer transforms warehouse operations from manual, disconnected processes to a mobile-first smart warehousing solution—in under 30 days.

The Challenge:

Manufacturer received hundreds of shipments daily from dozens of suppliers for large-scale industrial assembly, but warehouse operations ran completely offline—disconnected from inventory and ERP systems, with no material traceability or governance.

The lack of visibility and traceability of materials directly impacted production timelines, efficient use of warehouse space, and overall project delivery performance. 

Manual (2048 x 1000 px)

The Solution:

Customized mobile app with QR scanning integrated to ERP and barcode printers, delivered in less than 30 days. 

The Results:

check 3
100% elimination of phantom materials with digital tracking and automation enabling real-time visibility into stock levels and storage locations
check 3
Eliminated contract risks and penalties from violating contract covenants tied to schedule and delivery dates 
check 3
Elimination of emergency reorders due to lost, short shipped, or damaged materials
check 3
Implemented reliable materials management processes enabling more competitive bidding and pricing strategies
check 3
Shared digital visibility has broken down silos between procurement, operations, and project management
check 3
Optimized procurement decisions to limit reorders and expedited shipping
check 3
Established mobile-first digital infrastructure creating a foundation for future automation and scale
check 3
Skeptics became champions as warehouse workers went from resistance to change leaders

Bottom Line:

Kinetech delivered a mobile-first smart warehouse solution in only 3 weeks that integrated seamlessly with their existing ERP and institutionalized their warehouse processes without forcing undesired operational changes. 




factory
01
Company Profile

 

Vector (7)
Industry:
Industrial manufacturing
Size
Size:
Multiple warehouses, receive 100+ shipments weekly
Core
Core Business:
Integrated solutions for power, automation, and control systems in various industries including oil and gas, industrial and renewal energy
timeline
Challenge Timeline:
Less than 30 days transformation from offline to digitally automated 

 




Untitled design - 2025-08-08T181337.049
02 - The Challenge:
When ‘Good Enough’ Is Not Enough 

This industrial manufacturing company’s warehouse operations were performing well enough—supporting the building of complex industrial solutions for major oil, gas, renewable energy and construction projects. Their operations worked, but they worked the hard way and the challenges of the status quo were quickly growing. 

The manufacturer faced a critical operational blind spot in managing materials that flowed from dozens of suppliers into their warehouse daily. These materials supported the construction of large-scale industrial products that were assembled on-site before being shipped to customer locations. Despite the importance of this process, material traceability and governance did not exist. The symptoms were clear and costly:

System Landscape

Primary System:
Homegrown siloed ERP for ordering
Secondary Systems:
Individual Excel sheets per manager
Communication:
Email chains with no audit trail
Documentation:
Printed documents and manual notes
Knowledge Base:
Tribal knowledge for critical material placement and stock levels needed for production

The Daily Pain Points

Phantom Materials:
ERP shows order and arrival, but physical location unknown after receipt
Time-Consuming Searches:
Hours spent hunting for materials that should have been readily available
Routine Emergency Reorders for materials already on-site but unaccounted for
 
Manual Cross-Referencing:
No clear connection between materials and specific jobs
Accuracy Concerns:
Manual processes created data reliability issues that impacted project delivery
No Governance:
Anyone could move materials without proper tracking or controls

The Breaking Point:

Picture this scenario: You need materials today, they are not there. Procurement swears they ordered and received them on time, but somehow they have been used elsewhere or lost. Now you are facing 8-12 weeks to reorder, production delays, contract issues, and unhappy clients whose projects are now behind.

The warehouse crews spent hours searching for materials that should have been readily available. Staging areas were cluttered with materials of unknown status. Without location information, they resorted to physically searching warehouses looking for labels written on shipping crates. 

Previous attempts to build custom solutions had been unsuccessful, leaving the team skeptical of new technology solutions.




f27efd1f-0223-425e-9188-b211b93e55e1 2 (4)
03 - The Kinetech Solution:
Built Around Your Process, Not Against It

 

Technology Platform

custom
Custom application built with Mendix for real-time warehouse management
Group 205
Barcode generation and scanning for instant identification
Vector (8)
Seamless ERP integration to break down silos between procurement, operations, and project management
phone
Mobile-first design enabling management from the shop floor

Implementation Approach: Methodical Speed

Pre-Kickoff (Week 0):
Discovery and Requirements
  • Comprehensive requirements gathering with key stakeholders
  • Workflow documentation and pain point analysis
  • Technical assessment and integration planning
  • Solution architecture and project scoping
Phase 1: (Weeks 1-3)
Core Material Management 
  • Week 1: Core development begins and initial ERP integration
  • Week 2: Mobile app development and core functionality build
  • Week 2.5: On-site prototype demonstration to warehouse team
  • Week 3: Refinement based on user feedback and pilot deployment
Phase 2: (Weeks 4-6)
Enhanced Functionality Building on Phase 1's success, new development focused on:
  • Existing Inventory Management: Handle materials already in warehouse prior to system implementation
  • Advanced Integrations: Direct label printer connectivity and enhanced ERP workflows
  • Process Optimization: Additional automation and workflow refinements based on user feedback
  • Production Deployment: Full go-live with comprehensive training and support
Total Timeline:
Less than 7 weeks from requirements to full production deployment



f27efd1f-0223-425e-9188-b211b93e55e1 2 (5)
04
The Transformation Moment

 

When Kinetech demonstrated the working application onsite after just 2.5 weeks, the warehouse team's response was immediate and telling:

"When are we going to be able to get this?"

The application workflow was instantly recognizable—workers could see their exact daily processes reflected in the software, but now with digital precision and real-time accuracy.




f27efd1f-0223-425e-9188-b211b93e55e1 2 (6)
05 - Results
From Hours to Seconds

Operational Transformation

  • Inventory Accuracy: Achieved 100% accuracy from day one
  • Search Time: From hours of hunting to instant material location
  • Processing Volume: Successfully managing 100+ shipments daily
  • Data Confidence: Real-time traceability replacing manual tracking processes
  • Production Bottlenecks: Eliminating with optimized procurement 

The Numbers That Matter

  • Thousands of shipments processed since February deployment
  • Perfect material traceability with complete audit trails
  • Zero phantom material through systematic barcode tracking
  • 100% user adoption with enthusiastic warehouse advocate

Qualitative Impact: Skeptics to Champions

"We open the app, we look up the job number, and we see the location, and we walk right over to it." 

- Warehouse Manager

The warehouse crew who were initially most resistant became the application's biggest champions. This transformation from skepticism to advocacy demonstrated not just functional success, but cultural acceptance.




f27efd1f-0223-425e-9188-b211b93e55e1 2 (7)
06
Key Success Factors

  1. Perfect Solution Fit

The application was built specifically for their operations based on their processes, not the other way around. Through direct engagement with warehouse personnel, project managers, and procurement the Kinetech team ensured the solution enhanced existing workflows rather than forcing process changes.

  1. Rapid Value Demonstration

A working prototype in 2.5 weeks generated immediate excitement and buy-in from end users who could instantly recognize their daily processes in the software.

  1. Seamless Hardware Integration

Full integration with warehouse infrastructure including label printers created a complete tracking workflow:

  • Generate QR codes upon shipment receipt
  • Automatic printing via integrated warehouse printers
  • QR codes physically attached to shipments
  • Shipments moved to designated warehouse locations
  • When parts needed: scan location QR code → scan shipment QR code = complete traceability of consumption and movement
  1. Integration Excellence

Seamless connection to existing homegrown ERP meant no disruption to established data flows or data integrity. 

  1. Mobile-First Design

Built specifically for warehouse environments and handheld device usage, ensuring practical usability in real working conditions.

 



f27efd1f-0223-425e-9188-b211b93e55e1 2 (8)
07
The Foundation for Future Growth

This material management application represents more than operational improvement—it establishes a digital foundation for clients' continued digital evolution.

Expandable Architecture

The Mendix platform provides a scalable foundation for additional modules:

  • Advanced analytics and reporting for performance and obsolescence tracking 
  • Tighter integration with suppliers 
  • Automated reorder systems to optimize procurement

Proven Success Model

This project established a replicable success model - demonstrating that digital transformation can enhance rather than disrupt proven processes, building confidence for future growth.




Kinetech Perspective: Enhanced Foundation

“We took a client who was already successful and brought clarity and enhanced foundation to them in a way where they are now set to add even more value to what they are doing.” 

- Luke, Kinetech Development Team




Why This Matters for Your Business

This clients’ story demonstrates that even complex, manual operations can be transformed quickly without disrupting proven business processes. The key is finding a partner who understands that the best software doesn't force change—it amplifies what already works.

Ready to achieve 100% inventory accuracy without changing your proven processes?

 



Kinetech specializes in rapid development of customizable solutions built with Mendix that fit your process perfectly. No forced changes. No unnecessary complexity. Just results in less than 30 days. 

Steel Manufacturing Company: From ERP Failure to Digital Excellence
Image of Ricky Volz
Ricky Volz
How Global Manufacturer Transformed QC with Tool Management
Image of kinetech
kinetech
{% module_block module "widget_fdfcc260-bce4-44d3-862c-9f3d3496bbec" %}{% module_attribute "card"...
Composable Real-Estate Investment Portal Configured in 10 Weeks.
Image of kinetech
kinetech

Combining CRM, financial, and data visualization capabilities enables record growth.

  • Kinetech...